Template:East Rail line RDT

From blackwiki
Jump to navigation Jump to search
style="color:#ffffff;background:#Template:Rcr;text-align:center;padding:5px"|
East Rail line
Template:Stl
Template:Stl
Template:Stl
planned
Template:Stl
Template:Stl
Wo Hop Shek
1950–1983
Template:Stl
Hong Kong Railway Museum
Template:Stl
Template:Rws
1910–1983
Tunnels No. 5 and 5A
Template:Stl
proposed
Template:Stl
Ho Tung Lau Depot
Template:Stl
(racing days only)
Template:Stl
Template:Stl
Template:Stl Template:Rcb
Tai Wai Depot
(Tuen Ma line)
Beacon Hill Tunnel
(Tunnel No. 2)
Template:Stl Template:Rcb
Template:Stl
Tunnel No. 1A
Template:Rmri former KCR (1910–1975)
Hung Hum
1910–1921
Template:Rws
1910–1975
1
2
1: East Rail line tracks until 2009
2: Through Train tracks
Template:Stl Template:Rcb
Stabling sidings
(East West Corridor)
Template:Stl
opening 2021
Template:Stl Template:Rcb Template:Rcb Template:Rcb
opening 2021

Template:Rdt intro

  • Freight service was fully withdrawn in 2010.[1]

References

  1. "柴油火車駛進集體回憶 (lit. Diesel train heads toward collective reminiscence)". The Sun (Hong Kong). 7 November 2009. Retrieved 2009-11-10.